Ingenium Projects
Ten real projects in the ingenium sector, from a single drawing revision to a full engineering program. Involvement in a project means participating in the project and sharing in its actual net revenue — the Participant Pool is 10% of each project’s net revenue, distributed monthly among qualifying participants. It is not a yield on ING and no return is promised.
Each project has a participation gate: hold ING worth 1% of the project’s value (in CAD). The gate is a balance check only — nothing is spent, transferred, or locked, ever. Holds stack: your balance must cover the sum of the gates of every project you join. Involvement stays active only while your wallet is connected and the hold is met; if the balance drops or the wallet disconnects, involvement suspends and resumes automatically when the hold is restored.
Need ING? Buy ING on XMarkets · Mine ING on Omnichain
Drafting & Design Services Studio T1 Bootstrap
Builders, fabricators, and small manufacturers constantly need proper drawings — shop drawings, as-builts, permit sets — and can't carry a drafting department.
| Project value | $31,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Studio operating, first 10 clients |
| Participation gate | Hold ≈ — ING ($310 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-job drafting fees plus monthly design-support retainers for repeat clients. Revision discipline is the product: fabricators re-order from the studio whose drawings never cost them a remake.
What involvement gets you: the pool share; jobs and client reporting; a drafting package for a project a holder is building, at studio rates.
Milestones: Studio operating, first 10 clients · retainer base covering core capacity · permit-set specialisation for local builders · second discipline (mechanical design support) added
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Prototype & Testing Workshop T1 Bootstrap
Inventors and small companies stall between the sketch and the first working thing.
| Project value | $43,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Workshop equipped, first prototypes delivered |
| Participation gate | Hold ≈ — ING ($430 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-prototype job fees plus bench subscriptions for repeat builders. Honest test records are the workshop's reputation: a prototype that fails well teaches more than a rendering that never could.
What involvement gets you: the pool share; prototypes built and testing reporting; a prototype assessment for a holder's own product idea, at workshop rates.
Milestones: Workshop equipped, first prototypes delivered · subscription benches at capacity · test-rig library covering common product categories · small-batch pilot production support added
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Building & Site Engineering Services T2 Startup
Small and mid-size construction projects need real engineering — structural design, site servicing, grading and drainage — without the overhead of a large consultancy.
| Project value | $128,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Structural and site services stamped and delivered |
| Participation gate | Hold ≈ — ING ($1,280 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-project engineering fees by discipline and stage. Builders return to engineers whose designs pass review the first time and whose site answers come when the pour is scheduled, not after.
What involvement gets you: the pool share; projects engineered and reporting; an engineering assessment for a building project a holder is advancing.
Milestones: Structural and site services stamped and delivered · builder retainer relationships in place · field inspection services added · second licensed discipline under the same roof
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Energy & Building Systems Engineering T2 Startup
Buildings waste energy in ways a proper audit can name to the dollar.
| Project value | $198,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Audit practice at full bookings |
| Participation gate | Hold ≈ — ING ($1,980 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: audit and design fees, plus retrofit program contracts for building owners and municipalities. Measured savings after the retrofit — not modelled ones — are the firm's calling card for the next portfolio.
What involvement gets you: the pool share; buildings audited and measured-results reporting; an energy audit for a building a holder owns, at firm rates.
Milestones: Audit practice at full bookings · first portfolio retrofit program engineered · post-retrofit measurement published per portfolio · new-build systems design line added
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Industrial Process Engineering Firm T3 Growth
Process plants lose money in throughput, downtime, and quality drift that nobody has engineered out because the plant's own staff are busy running it.
| Project value | $530,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First plant studies delivered with verified baselines |
| Participation gate | Hold ≈ — ING ($5,300 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-project engineering fees and annual process-support retainers. Measured improvement, stated conservatively and verified with the client, is what turns one study into a standing relationship.
What involvement gets you: the pool share; engagements and measured-outcome reporting; a process study assessment for a plant a holder operates.
Milestones: First plant studies delivered with verified baselines · retainer base across three plants · commissioning services team formed · second industry vertical (food/process or mining) opened
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Innovation Lab & Contract R&D Services T3 Growth
Companies with product ideas and no laboratory stall at the same wall: design it properly, simulate it, test it to failure, document all of it.
| Project value | $870,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Lab commissioned, first contracts at stage gates |
| Participation gate | Hold ≈ — ING ($8,700 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-project R&D contracts by stage, plus standing lab agreements for companies with continuous development pipelines. Stage-gated work keeps clients in control: each stage is bought on the previous stage's documented results.
What involvement gets you: the pool share; projects and stage reporting (client-confidential results stay confidential); an R&D scoping assessment for a product a holder is developing.
Milestones: Lab commissioned, first contracts at stage gates · simulation capability at full utilisation · testing certifications for client industries · second lab bay on pipeline demand
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Multi-Discipline Engineering Consultancy T4 Established
Civil, structural, mechanical, and electrical engineering under one roof and one project record: owners and developers get a single accountable consultancy for whole projects, from feasibility through design to construction support, with every discipline's work coordinated in the ERP instead of across four firms' email..
| Project value | $3,600,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | All four disciplines staffed and stamping |
| Participation gate | Hold ≈ — ING ($36,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-project consultancy fees across disciplines, plus framework agreements with repeat owners. Coordination is the premium: a design conflict caught in the model costs a meeting; caught on site it costs a season.
What involvement gets you: the pool share; projects delivered and discipline reporting; a feasibility assessment for a project a holder is advancing, at consultancy rates.
Milestones: All four disciplines staffed and stamping · first whole-project delivery on one record · framework agreements with two major owners · second office on regional demand
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Infrastructure Program Engineering Group T5 Large
Public infrastructure owners — municipalities, utilities, agencies — need engineering capacity at program level: design management across many projects, owner's-engineer review, standards, and asset records that outlive any single project.
| Project value | $16,200,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First multi-year program agreement operating |
| Participation gate | Hold ≈ — ING ($162,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: multi-year program engineering agreements, priced per program scope. The group wins renewals the way owner's engineers do: the owner can see every decision and its basis, years later, in one place.
What involvement gets you: the pool share; programs served and reporting (within client disclosure terms); a program engineering review for an owner organisation a holder leads.
Milestones: First multi-year program agreement operating · owner's-engineer review practice at full caseload · asset-record standard adopted by client owners · second program region under agreement
Status: Slate — awaiting owner launch approval. Joining opens at launch.
National Engineering & Innovation Program T6 Mega
A staged national program building engineering capacity the way the slate built it locally: regional engineering centres in underserved areas, innovation labs attached to them, training pathways for technologists and engineers, and shared specialist services no single region could carry — each centre operating as a working practice, recorded in the ERP, before the next is committed..
| Project value | $132,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First regional centre at full practice |
| Participation gate | Hold ≈ — ING ($1,320,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: the centres' own engineering earnings as they come online (design, R&D, program services), each stage financed and reported inside the one program record. Centres are funded as practices that bill and reported as practices that billed.
What involvement gets you: the pool share; stage-gate operational reporting (centres live, work delivered, people trained); briefings before each stage commitment with the running centres' records in hand.
Milestones: First regional centre at full practice · innovation lab network graduating client products to production · technologist training pathway certified · second region committed on the first region's record
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Global Engineering Infrastructure Program T7 Giga
A decade-long program building engineering capacity internationally with local partners: engineering centres, laboratories, and training pathways in regions where projects stall for want of engineers — locally staffed, locally led, run to one documentation standard — with the ERP as the program's public registry: stages, centres, work delivered, and accounts in the open for the program's life..
| Project value | $555,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First international centre operating its full service range |
| Participation gate | Hold ≈ — ING ($5,550,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: the stages' own engineering earnings as they come online in each country, each stage financed and reported inside the one program record. No stage proceeds on the promise of a later one; local practices stand on their own records.
What involvement gets you: the pool share across program stages; stage-gate reporting in full operational detail; a permanent place in the program's participant registry as stages come online over the build-out.
Milestones: First international centre operating its full service range · local engineers leading practices independently · training pathways graduating cohorts in two countries · second-region expansion committed on operating records
Status: Slate — awaiting owner launch approval. Joining opens at launch.